Home > Installation & Maintenance

Tiles

PRE-WORKS

It is necessary to make sure the subfloor be on good conditions, as well as the surface temperature, humidity and ventilation.

  1. The subfloor must be flat and dry, all gaps and uneven places must be filled and leveled with proper compounds
  2. Floorcovering should not be installed to a subfloor when the temperature is below 15degC and a relative humidity is more than 75.

Note: The Installation Instruction listed below should be followed carefully. For more detailed information about the installation, please contact Archwell Customer Service.

201010_Tiles_jpg