Home > Installation & Maintenance
Rolls
PRE-WORKS
It is necessary to make sure the subfloor be on good condition, as well as the surface temperature, humidity and ventilation.
- The sub floor must be flat and dry, all gaps and uneven places must be filled and leveled with proper compounds.
- Floorcovering should not be installed to a subfloor when the temperature is below 15degC and a relative humidity is more than 75.
Note: The Installation Instruction listed below should be followed carefully. For more detailed information about the installation, please contact Archwell Customer Service.